Skip to content
Empower NJ: No Fossil Fuel Projects
Empower NJ: No Fossil Fuel Projects
Primary Navigation Menu
Menu
  • Home
  • About Us
    • Our Mission
    • En Español
    • Our Members
    • Join Coalition
    • Volunteer for the Clean Energy Campaign
  • Moratorium
  • Fossil Fuel Projects & FAQs
    • General FAQs
    • Gibbstown Logistics Center Terminal
    • Tennessee Gas Pipeline Compressor Station
    • BL England
    • Cape Atlantic Reliability Project (aka South Jersey Gas pipeline)
    • Garden State Expansion Project
    • Gateway Expansion (Roseland)
    • Keasbey Energy Center
    • Lambertville East Expansion
    • North Bergen Liberty Generating Station (aka Meadowlands Power Plant)
    • Northeast Supply Enhancement (NESE)
    • PennEast Pipeline
    • Phoenix Energy Center (aka Highlands Power Plant)
    • Rivervale South to Market
    • Southern Reliability Link
  • Highway Expansion
  • Blog/News
  • Resources
    • Background on Clean Energy Standard legislation
    • Completed and Pending Murphy Projects
    • Energy Master Plan resources
    • Our Report: The Case for a Moratorium
    • Our comments on the 2019 Energy Master Plan
    • EN ESPAÑOL: El Informe Ejecutivo
    • Public Forum Slide Show
      • Model Resolution
    • Keasbey Energy Center
  • Petitions
    • 100% Clean Energy by 2035
    • Earth Day petition
    • Enact the Moratorium
    • Stop LNG Exports
  • Contact Us
    • Volunteer for the Clean Energy Campaign

February 2019

Plan to Convert BL England Plant to Natural Gas Is Dead on Arrival

2019-02-28
By: empowernj
On: February 28, 2019
In: Uncategorized

After nearly a decade of bitter fighting, RC Cape May Holdings raises white flag over proposal to build natural-gas pipeline in Pinelands. The plan to convert the BL England power plant to natural gas, one of the most controversial projects proposed in the Pinelands, is dead — at least forContinue Reading

A dozen power plant and pipeline projects could derail Phil Murphy’s clean energy goals

2019-02-18
By: empowernj
On: February 18, 2019
In: Uncategorized

Gov. Phil Murphy will not be able to make his ambitious clean energy goals if he fails to stop 12 fossil fuel projects from moving forward, according to a report issued Wednesday [Feb. 13, 2019] by a coalition of environmental groups. Advocates say four proposed power plants along with eight pipelines andContinue Reading

Rally in Ridgefield Calls Out Folly of New Fossil Fuel Projects

2019-02-18
By: empowernj
On: February 18, 2019
In: Uncategorized

Advocates for clean energy and against proposed projects that would derail New Jersey’s efforts to meet its clean energy goals rallied in Ridgefield, NJ on February 15 to call on Gov. Murphy to enact a moratorium on new power plants, pipelines, and compressor stations in the state. See the newsContinue Reading

Report: 13 Frack Gas Projects Undermine Murphy Clean Energy Plan

2019-02-13
By: empowernj
On: February 13, 2019
In: Uncategorized

13 Frack Gas Projects Undermine Murphy Clean Energy Plan New report finds 32% spike in greenhouse gas emissions, law requires 80% cut Coalition for emergency moratorium in response to climate crisis Trenton, NJ, February 13, 2019 – A report released today documents the devastating climate impacts if 12 new frack gasContinue Reading

Empower NJ Announces the NJ Tour For a Fossil Fuel Moratorium

2019-02-07
By: empowernj
On: February 7, 2019
In: Uncategorized

New Jerseyans are joining together in opposition to the growing threat of new polluting pipelines, power plants, compressor stations, and other fossil fuel infrastructure proposals. They are lobbying local, state, and federal decision makers to take action to protect our air, water, and safety by denying a dozen NJ proposalsContinue Reading

Recent Posts

  • EmpowerNJ Analysis Shows Murphy Administration Not Serious About Climate Goals
  • Week of Action: Stop the Gibbstown LNG terminal!
  • Send a comment – reject the TN Gas Pipeline East 300 Upgrade!

Recent Comments

    Archives

    • April 2022
    • November 2020
    • October 2020
    • April 2020
    • February 2020
    • October 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019

    Recent posts

    • EmpowerNJ Analysis Shows Murphy Administration Not Serious About Climate Goals
    • Week of Action: Stop the Gibbstown LNG terminal!
    • Send a comment – reject the TN Gas Pipeline East 300 Upgrade!
    • Coalition calls for halt on hearings during Covid-19 crisis
    • Get the Facts at the Fracked Gas LNG Forum on February 7!

    Follow Us

    • Facebook

    Designed using Unos. Powered by WordPress.